Create Timesheet Entries with no Assignment (not indirect time)

Question asked by matpj on Feb 19, 2013
Latest reply on Feb 19, 2013 by Dave
Hi all,

i have looked on the forum and played around a bit but i'm drawing a blank.
I want to be able to create a timesheet to put time against a project task without having to specify the assignment.

Manually, I can add time in my timesheet to tasks I am not assigned to. I then become assigned.

How can I do this in XOG.
I tried removing the assignment attributes from the XML but it had an error saying I needed indirect time entry to be enabled.
Doing this puts the time in the 'Indirect' section of the timesheet.

Can anybody advise?


Thanks in advance,
Matt