-1 Error rcvd when Populating Cost Plan from Resource Plan

Discussion created by James_Baltao on May 4, 2011
Latest reply on May 6, 2011 by Chris_Hackett
Hello All.

I have a situation where Clarity is not letting me refresh a Cost Plan and returning a -1 error code.

When I attempt to refesh the Cost Plan using "Populate from Resoure Plan / by Assignments" the system displays the Red error box at the top of the screen with a Yellow Triangle and the only text displayed is "-1"

If I attempt to create a new Cost Plan / by Charge Code / by Assignments, the system returns the same error.

This is not happening to all proejcts but has surfaced with two projects over the last week.

Has anybody out there run into this issue before?

Help!!!
James