Job Scheduling Time

Question asked by sreeram.babu on Jun 15, 2011
Latest reply on Aug 31, 2011 by Dave
Hi

My Client is in Dallas, Texas. I working as support from India. I've designed a process which has to be scheduled as Job.

Since there is time difference

Now during Daylight saving difference is 1.5 hrs

after Daylight saving the time difference is 30 minutes.


So When I try to schedule a job now , consider like 11:45 PM IST, now the job will start at 1:15 AM CST

so after DLST, the same job starts at 12:15 CST

Is there any way to set the time , so that Job always start at 12:15 CST. I need to design the job from India, so I couldn't ask someone to design in Dallas, Texas

Any idea

Thanks

Sreeram