AnsweredAssumed Answered

How was the cost plan in the idea created?  Only MANUALLY created cost plans will covert over into the NEWLY converted project.  If the cost plan was created in the idea from team allocation or Team assignment, those type of cost plans will not covert...

Question asked by linda.hodge on Jul 22, 2014
Latest reply on Jul 23, 2014 by pjromano

How was the cost plan in the idea created?  Only MANUALLY created cost plans will covert over into the NEWLY converted project.  If the cost plan was created in the idea from team allocation or Team assignment, those type of cost plans will not covert from the idea to the project.

 

Linda Hodge

Sr Instructor

 

CA Technologies | 1001 Winstead Drive Suite 505 | Cary, NC 27513

Office: 919 552 2133 | Linda.Hodge@ca.com

 

<mailto:Linda.Hodge@ca.com>[CA]

 

<http://www.ca.com/us/default.aspx>[Twitter]<http://twitter.com/CAInc>[LinkedIn]<http://www.linkedin.com/company/1372?goback=.cps_1244823420724_1>[Facebook]<https://www.facebook.com/CATechnologies>[YouTube]<http://www.youtube.com/user/catechnologies>[Google]<https://plus.google.com/CATechnologies>[Slideshare]<http://www.slideshare.net/cainc>

 

Attachments

Outcomes