AnsweredAssumed Answered

Scheduling a job to run every other week (or, every two weeks).

Question asked by Robert Ensinger on Sep 5, 2014
Latest reply on Oct 23, 2014 by urmas

Hi folks.

  I don't think I've had to schedule anything bi-weekly yet. I've read online that '/2' mean 'every two', thus 0 7 * * 3/2 should mean 'ever other Wednesday at 7AM'. The Crontab box in the job schedule doesn't see this as a valid format.

 

Any idea on a 'every two weeks' or, more specifically 'every other Wednesday' crontab that the scheduler interface will accept?

Outcomes