I have made the configuration at task level like below:

project-->task-->assignments-->configured ETC by period to show as % Availability.

 

Now I have a resource with 7.50 availability and he has filled his actuals as 22 hours  and whenever I give  value to  ETC by period as 80 and save it, it is getting changed to 45.00.

Need to understand what kind of calculations it is making.

 