AnsweredAssumed Answered

how do you track a single story across iterations on a single kanban board?

Question asked by 8e0aa5ac47ccaff9250299a21d1747fd on Sep 9, 2015
Latest reply on Sep 10, 2015 by John_Streeter
Anyone have any best practices/advice for dealing with the following situation?
  • Each story goes through 4 phases (analysis, design, development, testing)
  • Each phase takes an iteration
Do I need to create a version of the story for each phase/iteration? For example, story 1 - analysis goes into iteration 1, story 1 - design goes into iteration 2, etc.? But then I can't see story 1 go through all my kanban states that span these 4 phases.

Any other ideas?

Thanks,

- Ariel