AnsweredAssumed Answered

Possibility to cascade suites while mixing parallel and serial execution

Question asked by Maurizio.Hostettler on Oct 27, 2016
Latest reply on Dec 28, 2016 by Maurizio.Hostettler

Hi all,

 

The idea is to create several suites, each containing a number of tests. All these suites should run their content in a sequential (serial) order.

I would also like to create a suite, containing all those suites mentioned before. But this time I would like to run those in parallel.

 

This would allow me to run a number of tests with a parallelity corresponding to the number of subsuites.

 

It is possible to cascade suites, however in this configuration, all the tests will run at the same time. It looks like the configuration from the “mastersuite” will also apply to the called subsuites.

 

Is there a reasonable way to achieve the goal from within CA DevTest?

 

Thanks for your opinion and ideas

Attachments

Outcomes