There is a Job: ABC which need to be schedule from 8am to 4PM on Sunday to Friday and it need to schedule on different time on saturday only that is from 6pm to 9pm. How to schedule it? Kindly suggest
I think there was a similar discussion about such a situation before. The easiest way would be to create 2 jobs. One that runs Sunday to Friday and a second that runs only on Saturday.