There is a Job: ABC which need to be schedule from 8am to 4PM on Sunday to Friday and it need to schedule on different time on saturday only that is from 6pm to 9pm.

  • 1.  There is a Job: ABC which need to be schedule from 8am to 4PM on Sunday to Friday and it need to schedule on different time on saturday only that is from 6pm to 9pm.

    Posted Dec 08, 2016 01:33 PM

    There is a Job: ABC which need to be schedule from 8am to 4PM on Sunday to Friday and it need to schedule on different time on saturday only that is from 6pm to 9pm. How to schedule it? Kindly suggest



  • 2.  Re: There is a Job: ABC which need to be schedule from 8am to 4PM on Sunday to Friday and it need to schedule on different time on saturday only that is from 6pm to 9pm.
    Best Answer

    Posted Dec 08, 2016 01:49 PM

    I think there was a similar discussion about such a situation before. The easiest way would be to create 2 jobs. One that runs Sunday to Friday and a second that runs only on Saturday.