AnsweredAssumed Answered

Adjusted Timesheet

Question asked by Art_Vendryes on Dec 21, 2016
Latest reply on Dec 22, 2016 by Art_Vendryes

I had something strange happen with the time posting this past week.  I completed the time posting process as normal.  When I checked there was an open timesheet that was not there earlier.  Somehow the resource was able to recall his timesheet.  I checked the time of the action and as far I could see it occurred after time posting was done.  The resource has normal team member rights and nothing other than enter time with regard to timesheets.  I did not think they had the ability to adjust timesheets.  The resource manager was not involved with recalling the timesheet. 

Has anyone seen this before?

Outcomes