When I have a block of jobs that has the resource lock, I want to be able free the resource at the end of the last job completion. If I can do it within a ARF condition code check of the last job, then I would like issue a free of resource rather than having the application team to make changes to the job itself. however I have not been successful in setting up this ARF condition/definition. But maybe I am trying to use ARF in a abstruse way that it was not defined to be used in successful job execution, rather than ARF is to be used in an unsuccessful condition to perform x action against a failed job defined with an ARFSET?