AnsweredAssumed Answered

Mass move of unfinished user stories

Question asked by GarySultan1340111 on Apr 27, 2017
Latest reply on Apr 29, 2017 by GarySultan1340111

When a sprint finishes, sometimes there are stories which are not finished. How can I move these unfinished stories to the next sprint without changing my velocity? Currently, I go one-by-one through each unfinished story and change the assigned iteration to the next sprint. However, there are two issues with this.

 

  1.        This is incredibly manual and time consuming. Can I do this in bulk?
  2.        When I change the iteration on a user story, the points are no longer counted in the iteration statistics. This is wrong – my velocity and burndown chart should reflect both the finished and unfinished work.

Outcomes