I've noticed that when a resource is made inactive and the Rate Matrix Extraction (full) job is run, the rate in the NBI_PROJ_RES_RATES_AND_COSTS table for that particular person sometimes changes. My assumption is that the rate set for that resource in the matrix becomes invalid so the system instead uses the role tied to that person on the Project to determine their current rate. This creates a discrepancy between this rate (NBI_PROJ_RES_RATES_AND_COSTS) and the stored rate in the WIP table in cases where the two rates differ.
Has anyone noticed this? And is this normal behavior?
Thanks in advance.
Note: Version is 13.2