AnsweredAssumed Answered

job triggering

Question asked by jchauvin on Aug 9, 2017
Latest reply on Aug 11, 2017 by Marysue

How do you setup the use of SCHID feature in CA7 to use the same JCL with the SAME job name to run a different version of say a 'batch cycle'?  I have a need to run say 30 jobs out of my master flow of 500 jobs.  I'm working with the SCHID number to control the jobs (1-255 ids).  However, existing jobs with RQJOB records are carried over when I set the job up in the new SCHID #.

Outcomes