Hi All
Our SYSTEM calendar has many holidays with name "HOLIDAY_2017".
We add holiday 2017/10/08 and 2017/10/29 with a new name "HOLYDAY_2017" in SYSTEM calendar and save it.
Our job set run scheduler with " Daily except holidays" and use calendar icon verifies job setting is correct.
but we use simulation test application the job creation on the result. Is abnormal.
Then We Modify 2017/10/08 holiday name from "HOLYDAY_2017" to "HOLIDAY_2017" and save again.
Test again job no creation.
Then use 2017/10/29 test the same job no create. we didn't modify holiday name. It back to normal.
I can't reproduce this problem again and verify job set is correct. very troubled.
Does anyone meet this situation? How to make sure didn't happen again? thanks a lot.
James