The Agile Central Database connector will write all the desired fields to the .csv file, and the log shows that the fields/columns are created in the PostGreSQL DB it is connected too, however, those columns never actually get added nor populated. Some fields are populated correctly (about 10 columns) but it misses about 8 columns. Those 8 columns are in the .csv however. I do not know if this is an issue with size of fields requested, if there is an issue with adding more fields after already have the table created once or what. Does anyone have any suggestions?