Automic Workload Automation

  • 1.  How to take the job name, report, variant and schedule time

    Posted Jun 04, 2014 03:40 AM

    Hello Team,

    We need to take the job list with report name, variant name, schedule time for all the jobs running for particular SAP System.

    Is there any way to take the report,variant names and schedule timings automatically instead of manually analysing all individual jobs.

    Please let me know the possiblilites.

    Thank You

    Saravana



  • 2.  How to take the job name, report, variant and schedule time
    Best Answer

    Posted Jun 04, 2014 11:13 AM

    I think you can use the DB.Reporting Tool to run a report on all objects using a particular type.

    Here's the link to the documentation that explains the tool DB.Reporting Tool