Michael_Lowry

How to set the alias of a task based on the output of a previous task in the same workflow

Discussion created by Michael_Lowry on Sep 8, 2015
Latest reply on Sep 8, 2015 by Michael_Lowry
I have a workflow with two jobs. I would like to find a way to set the alias of the second job based on the output of the first job. Is there a way to do this? If so, I have not discovered it. (I’m using V9 SP11 HF1.)

Outcomes