Krum_Ganev

Constantly running job

Discussion created by Krum_Ganev on Oct 10, 2017
Latest reply on Oct 17, 2017 by Krum_Ganev
Hello All,

We have SAP job that is set to run constantly in SAP.
The same was migrated from Control-M to Automic/UC4 as cyclic time event on every 1 minute.
If the job failed - it should start within 1 minute.

The logic applied in Control-M does not fit in Automic/UC4.

Im wondering what will be the most elegant and optimal way to schedule this job.
I will prefer the job to not run indefinitely.
I was thinking about this approach : 
Whenever job failed to rerun itself (from post-process tab)
To schedule another job to kill this once per week.

What would be your advise?

BR,
Krum Ganev

Outcomes