Hi Team,
We have a request create a calendar condition that the Job should trigger on 22nd and 22+7 days of every month can some one let me know how to create it in Version 12.0.1 along with a screenshot if possible.
We have a request create a calendar condition that the Job should trigger on 22nd and 22+7 days of every month can some one let me know how to create it in Version 12.0.1 along with a screenshot if possible.
(1) Build a MONTHLY keyword called MONTHLY.22ND and select the 22nd of the month within its rules.
(2) Build a ROLL keyword called MONTHLY.22ND.PLUS.7. It references MONTHLY.22ND and adds 7 days to it.
(3) Built a GROUP keyword called MONTHLY.22ND.AND.PLUS.7 as a combination of the above two keywords.
Of course all of my screenshots are V11;