KumarRahul605332

Query regarding event objects

Discussion created by KumarRahul605332 on Jun 13, 2018

We recently faced an issue wherein all the event objects supposed to trigger jobs around 11am on 6/10/2018 triggered it at 11.03am i.e. with a delay of around 2-3 minutes. All our time events are triggered via schedulers and have a max run time defined. For this event it was 11.01 pm. As a result of this issue the last instance of the job which was supposed to get triggered at 11 pm didnt run as event had exceeded the maximum runtime and quit.

So Is there any way we can set up a notification to go out in case event takes more time than the stipulated interval to trigger any instance of the job.