Hi,
I was trying to deploy SNMP controller DCD and mps_language_pack to one of relay HUB Robot from Primary HUB archive using admin console. It was taken 20+ min to complete deployment process. To reproduce this I repeated same and got same result. Is this timing is OK or it is too much. To speed up what need to do?
Using UIM 8.47, HUBs are connected in below architecture,
Primary HUB ==> Tunnel HUB ==> Relay HUB ==> Robot
Thanks,
Pavan Jadhav