Hi.
I have been using Autosys 11.3.6.
There is Job as follows.
-. JOB_A status:Failure
-. JOB_B status:FailureIn this case, when I changed the JOB_A to success as change_status (via WCC Console), was there any changed to success in JOB_B also?
Thanks in advanced.
Hello Han
If you change the job status of JOB_A from Failure to Success, Job status of Job_B won't change.
But if the starting condition of Job_B is s(JOB_A), then Job_B will be triggered.
Does it answer your question?
Regards
Jean Paul