AnsweredAssumed Answered

Retrieve status in pre-condition

Question asked by ben1984 on Dec 3, 2018
Latest reply on Dec 4, 2018 by Michael_Lowry

Dear all,

 

i need to get the current status of  JOBS.EXAMPLE.A in a pre-conditon of JOBS.EXAMPLE.B in the same workflow (JOBP).

 

I need to check the time and if the JOBS.EXAMPLE.B is running or not.

 

Currently i don't know how to do it.

 

If i check the status at the beginning the pre-condition has always the inital value and this is not changing.

 

Anyone who can assist? I guess its simple (hopefully)

 

Thanks in advance.

 

regards,
Benedikt 