I have auto-generated a calendar to run job 1 on the 3rd Wed of the month. I want to auto generate a second calendar to run job 2 on the Friday after the 3rd Wed of the month. Is there a way to do this generation? If not, why not add the ability to select a day, and then add a number of days to it? And for those about to say, just choose 3rd Fri, that won't work. Look at March 2019. 3rd Fri is 3/15. 3rd Wed is 3/20. Friday I want is 3/22.