Hi;
The averages are based on the total accepted during and after the last 3, best 3 and worst 3 iterations only. The average of the total iteration stream for accepted during and accepted after are NOT part of this chart. The dark green line through the chart is the overall trend line.
Last 3 Iterations; (Q1.SP5, Q1.SP6, Q1.SP7)
(36+33+14 = 79)... ave.=26.33
Best 3 Iterations; (Q4.SP5, Q1.SP4, Q1.SP6)
(33+36+33 = 102)... ave.=34
Worst 3 Iterations; (Q4.SP7, Q1.SP1, Q1.SP2)
(11+3+15=29)... ave.= 9.67
Please let us know if we are missing something vs. your interpretation.
See also https://docs.ca.com/en-us/ca-agile-central/saas/velocity-chart