Hello,
I have one task which I don't know how to do. If anyone would be able to send examples or information how to do that it would be great.
1) I have a separate WF1 which is starting my WF2. It also gets variables from the separate WF1
2) So I have this WF2 which has a job in it and the after the job is finished, I have post-process where I am checking report using PREP_PROCESS_REPORT. And if there is some "code sentence" I need to rerun the WF2 with the same variables on a new run, preferably scheduled x minutes later. If the "code sentence" is not present in the jobs' report, I just need to finish WF2 with no issue.
I hope my question is clear.
Also, is this even possible to setup in UC4?
We are using ONE Automation UserInterface Version 12.0.2+build.5745 JRE Version 1.8.0_141 64 Bit.
Thank you