CA Workload Automation Restart Option for z/OS Schedulers Tuesday Tip by Alisa Reynolds, Sr. Support Engineer for Aug 24,2011
The normal start up and shutdown order for CA 11 follows below:
Startup Order
1. CA Datacom/AD MUF. CA Datacom/AD MUF must completely initialize before
any attempt to start CA WA Restart Option (CA 11).
2. CA WA Restart Option(CA 11). CA 11 must completely initialize before starting any scheduling
packages like CA Jobtrac, CA Scheduler, CA 7 or CA ESP that interfaces with it.
3. CA Jobtrac, CA Scheduler, CA 7 or CA ESP
Shutdown Order
The shutdown order is the reverse of the startup order.
1. CA Technologies Scheduling packages such as CA Jobtrac, CA Scheduler, CA 7 or CA ESP.
2. CA WA Restart Option (CA 11).
3. CA Datacom/AD MUF.