AnsweredAssumed Answered

Generating Cost from Allocations on the IDEA Object

Question asked by McGoey on Mar 15, 2012
Latest reply on Mar 28, 2012 by McGoey
Currently on Version 12.06 with plans to upgrade very very shortly.

I'm trying to use the Idea as a true repository for estimates. I can assign roles/resources to the "team" on an Idea instance and can automatically generate ETCs based on the Start Date, Finish Date and Allocation % for each team member. The last piece is to take those ETCs and generate a labor cost estimate. All roles/resources are represented in my rate matrix with a rate. Any advice on how to get to labor costs on the Idea would be greatly appreciated. Also, if there's something in 13 that addresses this I'd love to know that too.

Thanks
Tim McGoey
Health Care Service Corp.

Outcomes