AnsweredAssumed Answered

Can I adjust WIP threshold in a Kanban Board from measuring # of Stories to a Sum of all Story Points in Lane?

Question asked by NitinJoshi1360115 on Jun 15, 2016
Latest reply on Jun 16, 2016 by NitinJoshi1360115
I have a Custom Kanboard set up with various Swim Lanes based off a "Kanban State" field. Currently the WIP only measures the number of catrds in a specific lane. I'd like the WIP to be a summary of all Story/Defect points as the threshold.

Is there a way to do this?

Thanks

Outcomes