Hi Community!

We have had a few users asking if there was any way to shorten JDE Job times when they are running longer then desired. One way to speed up the reporting of the end status of the JDE job is to disable sending the job report back to the Automation Engine. This would only be viable if you have no need for the Automation Engine to receive the JDE Job report (many users do not require this). If this is a viable option, simply open the JDE job, navigate to the RA Tab and make sure all options under "Job Report" are disabled or unchecked. Save and close the job.

I hope this has been helpful! 